• Ministry of Water and Energy
    Ministry of Water and Energy
    MoWE
  • Digital Exhibition Center
    The Digital Exhibition Center that has been established at the Ministry of water and Energy
    serves as a hub for showcasing the nation's water and energy resources, development projects, and related technologies.
  • Grid-Tied Rooftop Solar Project
    The Ministry of Water and Energy in collaboration with The International Solar Alliance has installed a 100 KW solar project.
    The Project is considered to be a model for future project as it is the first ever grid-tied solar rooftop project in Ethiopia which also serves as a car parking facility.
  • Grid-Tied Rooftop Solar Project
    The 100 KW Solar project which has been installed at The Ministry is the First ever Grid-Tied Rooftop solar Project in Ethiopia.
    The Project is considered to be a model for future project as it is the first ever grid-tied solar rooftop project in Ethiopia which also serves as a car parking facility.
  • The Ministry of Water and Energy’s Digital library
    The Ministry of Water and Energy’s Digital library has been instrumental in making water related and energy related research
    The Digital library has featured two main technological advancements; the first one being the conversion of hard copy material to softcopy/Digital material and the second one being the creation of virtual library.
  • The Ministry of Water and Energy’s Digital library
    The Ministry of Water and Energy’s Digital library has been instrumental in making water related and energy related research
    The Digital library has featured two main technological advancements; the first one being the conversion of hard copy material to softcopy/Digital material and the second one being the creation of virtual library.
  • Gibe III hydroelectric power project
    The Gibe III hydropower project is located within the Omo Gibe River Basin, approximately 450km south of Addis Ababa
    The 296 m-high Gibe III dam has a crest length of 630m. Its reservoir has a total storage capacity of 14 billion cubic meters. It has a capacity of generating 1870MW.
  • Gibe III hydroelectric power project
    The Gibe III hydropower project is located within the Omo Gibe River Basin, approximately 450km south of Addis Ababa
    The 296 m-high Gibe III dam has a crest length of 630m. Its reservoir has a total storage capacity of 14 billion cubic meters. It has a capacity of generating 1870MW.
  • Grand Ethiopian Renaissance Dam Project (GERD)
    The dam that will help to transform Ethiopia into the ‘green lung’ of Africa
    The Grand Ethiopian Renaissance Dam project is located approximately 500 km north west of the capital Addis Ababa, in the region of Benishangul - Gumaz along the Blue Nile.
  • Grand Ethiopian Renaissance Dam Project (GERD)
    The dam that will help to transform Ethiopia into the ‘green lung’ of Africa
    The Grand Ethiopian Renaissance Dam project is located approximately 500 km north west of the capital Addis Ababa, in the region of Benishangul - Gumaz along the Blue Nile.
0

H.E Dr. Ing. Sultan Welle Ahmed


follow me
H.E Dr. Ing. Sultan Welle Ahmed

News

Announcement